It's been an unbelievably long time since I finished building the mast and last posted about it here in (October 2007). Things do get in the way, despite best intentions when undertaking a project like this! Anyway, the mast has been hanging from the rafters all this time, covered in the dust of building and fairing the hulls. I lowered it down last week and pulled it out enough to get to the masthead end and begin the tedious task of sheathing it in fiberglass:
Round objects are not the easiest things to fiberglass, but it's not as bad as it would seem if you plan in advance and use the masking tape method to avoid epoxy runs and ragged fiberglass cloth overlaps. As seen above, the masthead section has the additional complication of the shroud hounds to go around, as well as the mast cap and crane.
The other sections, as shown below, are simply round and are best done in by going around half of the circumference at time. After the epoxy cures, the tape is cut away, a weave-filling second coat is applied, and the mast is rotated 180 degrees to complete the other side. I'm working in 4-foot sections, as the roll of 6-oz. glass cloth I have on hand is 48 inches wide.
There are specially-made fiberglass sleeves that fit on like a sock that some people use for processes like sheathing round masts, but with the hounds and mast step protruding from each end of the spar, it seemed to me like this might be difficult to get on. In addition, these sleeves are much more expensive than ordinary glass cloth. At any rate, by using the taping method, this is a straightforward operation and will result in neatly-sheathed spar when it's all complete and the cloth has been filled, faired and sanded. The mast will be painted the same Off-White as the decks.
Below, the top 12 feet or so is now sheathed. The short PVC pipes protruding from the masthead are the wiring conduits, which will be cut shorter and capped off with PVC elbows to keep rain out once the wiring is run.